Automated Process Control System of gas-turbine plant
• Kazan Thermal Power Plant-1, Automated Process Control System of 50MW gas-turbine plant based on "Ovation" hardware and software (Emerson).
• "Nizhnekamsk-Neftekhim", OJSC, Data collection and transfer system of 75MW gas-turbine plant.
• Lida Thermal Power Plant, Lida (Belarus), Automated Process Control System of 25MW gas-turbine plant based on "Ovation" hardware and software (Emerson).
Purpose:
Gas-turbine control system is designed for control of all gas-turbine plant components: gas-turbine power plant, waste heat boiler, booster gas compressor, and electric part of gas-turbine plant.
The system provides:
• Unit automatic startup with connection to consumer’s network;
Functions of:
• Remote control;
Hardware and software product is implemented on the base of "Ovation" (Emerson). Typical solutions for Power Industry and other industriesAutomated Process Control System of power unit
|
||
|
© 2001-2011 "KER-Avtomatika", branch of "KER-Engineering", OJSC P.O.Box 50, Naberezhnye Chelny, Russia, 423831
|